Chiuso Bando europeo
Large-scale production of liquid advanced biofuels and renewable fuels of non-biological origin
Pubblicato dalla Commissione europea
Large-scale production of liquid advanced biofuels and renewable fuels of non-biological origin è un bando europeo del programma Horizon Europe, gestito dalla Commissione europea o da una sua agenzia (codice HORIZON-CL5-2026-02-D3-01). Il budget del bando è di 33 milioni di euro, per circa 3 progetti. Per ogni progetto: fino a 11 milioni di euro. Il bando è chiuso: le domande si potevano presentare fino al 17 febbraio 2026.
Le cose da sapere
Dalla scheda della fonte ufficiale: fa fede l'avviso dell'ente.
- Programma
- Horizon Europe
- Area di Horizon Europe
- Clima, energia e mobilità
- Codice del bando
- HORIZON-CL5-2026-02-D3-01
- Call
- HORIZON-CL5-2026-02 - Cluster 5 Call 02-2026 (WP 2025)
- Tipo di azione
- HORIZON Innovation Actions
- Come si partecipa
- Una fase: si presenta la proposta completa
- Apertura
- 16 settembre 2025
- Scadenza
- 17 febbraio 2026
- Budget del bando
- 33 milioni di euro (2025)
- Progetti finanziati
- circa 3
- Contributo per progetto
- Fino a 11 milioni di euro
- Aggiornato dalla fonte
- 25 giugno 2026
La descrizione ufficiale
Il testo del portale della Commissione europea, in inglese come l'originale.
Leggi tutta la descrizione
Expected Outcome
A quite wide portfolio of technologies, which are close to be deployed but still lack the real-world demonstration of economic viability, exists. Significant volumes of advanced biofuels and renewable fuels of non-biological origin (RFNBOs) are needed to cover the current fleets and the sectors where renewable fuels are the main long-term solution, such as aviation and shipping and energy-intensive industries. Therefore, an exceptional effort is needed to establish more successful projects where full-scale plants are built and operated based on the vast potential of sustainable feedstocks throughout the EU.
Project results are expected to contribute to all of the following expected outcomes:
- Energy producers and consumers in transport and energy-intensive industries benefit from the mobilisation of building of industrial capacity for advanced biofuels and renewable fuels of non-biological origin;
- Technology developers benefit from the support to the preparation of first-of-a-kind plants of advanced biofuels and/or renewable fuels of non-biological origin to become precursors for the following commercial plants;
- Technology providers benefit from the de-risking of the innovative technologies, reduction of CAPEX and production costs, boosting of scale-up and contribution to market up-take of advanced biofuels and/or renewable fuels of non-biological origin;
- Public authorities, citizens, researchers, and industrial stakeholders benefit from the improvement of the sustainability, reliability, robustness, and security of the relevant value chain;
- National authorities profit from the provided evidence for innovative advanced biofuels and/or renewable fuels of non-biological origin technologies, which can contribute to the Renewable Energy Directive indicative target for innovative renewable energy technology in each Member State of at least 5 % of newly installed renewable energy capacity by 2030, as well as to the targets under ReFuelEU Aviation and FuelEU Maritime.
- Policy makers and regulators profit from the provided factual information and evidence in view of their decision as regards accelerating permitting procedures, harvesting benefits from multiple uses of land and water and increasing the responsiveness of research and innovation in that field to diverse societal interests and concerns;
- The implementation of the Strategic Energy Technology Plan (SET Plan) Action for Renewable Fuels and Bioenergy is supported and facilitated.
Scope
Demonstrate innovative large-scale production of liquid advanced biofuels and/or renewable fuels of non-biological origin for sectors with specific need for such fuels (particularly aviation and shipping and energy-intensive industries). Production is expected to be based on various EU sustainable biomass feedstocks, notably biogenic residues and wastes, biogenic part of slurries and industrial wastes, and/or on non-biological origin feedstocks, such as renewable hydrogen and CO2 or renewable carbon, nitrogen, or their compounds, through chemical, biochemical, biological, and thermochemical pathways, or a combination of them. Proposals are expected to:
- demonstrate large scale production of ready-to-deploy advanced biofuels and/or renewable fuels of non-biological origin, engaging feedstock developers and suppliers, technology developers, fuel suppliers, end users for purchasing the quantities, national bodies, and public or private authorities with funding capacity;
- address and assess the impact of actual, real-size feedstocks, (like for example agricultural wastes, energy crops grown on marginal and degraded lands or as intermediate crops, forestry wastes, biogenic municipal and industrial wastes, all types of renewable hydrogen, actual streams of CO2 and nitrogen, available renewable carbon or their compounds), in terms of their constitution on plant design, (e.g. for feedstock pretreatment and wastewater treatment as appropriate);
- address and assess the impact on plant design and feasibility of improving the feedstocks externally and upstream to the fuel production plant, by increasing the energy density of the feedstocks through for example torrefaction, by homogenisation of feedstocks for making them uniform or similar, and by standardisation of feedstocks, as appropriate.
Projects should produce a lifetime cycle analysis of their production route and in particular for renewable fuels of non-biological origin, as inputs in terms of renewable energy and material (CO2, nitrogen, renewable hydrogen) may not be continuously available.
Production of renewable hydrogen as an end-product is excluded from the scope of this topic.
The projects are expected to result in reference cases for ready-to-build, revamp/reuse and/or operate full-scale plants of advanced biofuels and/or renewable fuels of non-biological origin. Improvements, optimisation, new schemes and modification of existing demonstration plants that can result into the preparation of the next full-scale plant are considered within scope to encourage deployment of cost-effective solutions.
The plan for the exploitation and dissemination of results should include a strong investment and business case and sound exploitation strategy. The exploitation plan should include plans for scalability, commercialisation, and deployment. It is expected to provide information and assessment about the economic viability of the commercial plant, the permitting procedures, a full value chain-based business plan and identified funding sources such as private equity, loans, loans guarantee, grants, or public financing for CAPEX and OPEX, as well as take-off agreements for the fuel uptake. Moreover, they should provide information on, or linked to, the identified funding sources, like private equity, the InvestEU, the EU Catalyst Partnership, the Innovation Fund, and possibly the European Regional Development Fund programmes. Projects are expected to include at least one relevant local economic business case, outlining local value and supply chains and the expected number of local jobs at the place of deployment. Furthermore, proposals are expected to provide information and assessment of impact on land and water use, soil and biodiversity, for example in relation to marginal and degraded land feedstocks, and of public awareness on full-scale renewable fuel plants.
An assessment of the sustainability and the GHG reduction from fossil equivalents should be shown based on a life-cycle analysis for the large-scale fuel production. Special attention should be paid to estimating the GHG emissions reduction potential; projects are encouraged to use the methodology in the Innovation Fund.
Activities are expected to achieve TRL 7-8 by the end of the project - see General Annex B. Activities may start at any TRL.
Fonte: portale Funding & Tenders della Commissione europea , © Unione europea, licenza CC BY 4.0 .
Documenti ufficiali
La fonte non elenca documenti: li trovi sulla pagina ufficiale del bando. Apri la pagina ufficiale
Domande su questo bando
Quando scade?
Il bando è chiuso: le domande si potevano presentare fino al 17 febbraio 2026. Molti bandi tornano ogni anno con regole simili: tieni d'occhio i bandi aperti dello stesso programma.
Quanto si può ottenere?
Il contributo per ogni progetto arriva fino a 11 milioni di euro. Il budget complessivo del bando è di 33 milioni di euro, per circa 3 progetti.
È a fondo perduto?
Sì: i bandi della Commissione europea danno contributi che non si restituiscono, di solito una parte dei costi del progetto, versata in più rate durante il progetto.
Dove si presenta la domanda?
Sul portale Funding & Tenders della Commissione europea, con un account EU Login. In questa scheda trovi il link alla pagina ufficiale del bando e ai suoi documenti.
Fonte: portale Funding & Tenders della Commissione europea. Controllato da Bandabando il 10 ottobre 2026.
Bandabando riassume le informazioni pubbliche per aiutarti a orientarti: fa sempre fede l'avviso ufficiale dell'ente. Come lavoriamo: fonti e metodo.
Fa per la tua impresa?
Il Capobanda è l'assistente di Bandabando: legge l'avviso al posto tuo e ti risponde con la fonte.
- Controlla i requisiti sulla tua impresa
- Ti dice quanto puoi chiedere e per quali spese
- Prepara l'elenco dei documenti della domanda
Gratis. Accedi con Google, Microsoft o la tua email.
Non perderlo di vista
Bandi simili
Aperti o in arrivo, scelti per territorio e tema.
- Data sharing to support the training and development of AI foundation models in the energy sector Scade il 1º dicembre 2026. Scade tra 22 giorni
- De-risking renewable fuel technologies through transnational pre-commercial procurement of renewable fuel industrial value chains Scade il 1º dicembre 2026. Scade tra 22 giorni
- Demonstration of solid biofuel supply and conversion to high efficiency CHP from fully sustainable regional value chains Scade il 1º dicembre 2026. Scade tra 22 giorni
- Improved system design for innovative PV applications (EUPI-PV Partnership) Scade il 1º dicembre 2026. Scade tra 22 giorni
- Resource assessment for deep sedimentary and basement reservoirs Scade il 1º dicembre 2026. Scade tra 22 giorni
- Advancing understanding, modelling and prediction of extreme events in a changing climate Apre il 17 novembre 2026. Apre tra 8 giorni